Ze Global successfully delivered the Core Shed Process Flow Improvement project, which optimized workflows, reduced manual handling, and enhanced overall operational efficiency in core processing. This project introduced advanced roller table systems, a streamlined layout, and a one-direction process flow to improve productivity and reduce downtime.
Key Features:
- Core Shed Redesign:
- Redesigned layout with a one-directional workflow to eliminate back movements and double handling.
- Dedicated zones for core cutting, sampling, and storage to streamline operations.
- Advanced Roller Table System:
- Angle and flat roller tables to support seamless core movement.
- Reduced manual handling through optimized table placement and dimensions.
- Core Cutting Room Optimization:
- Adjusted cutting machine directions to align with the new process flow.
- Reduced manual lifting by incorporating roller tables and ergonomic designs.
- Mobile Core Photo System:
- Upgraded photo stands for real-time quality assurance and improved accessibility.
- Fully mobile setup for unrestricted use across different roller table sections.
Visual Media Section:
- Video: Embed an animation showcasing the new core shed layout, roller table systems, and process improvements.
- Technical Details: Display visuals of the redesigned layout, roller table configurations, and comparison charts.













Project Impact:
- 30% reduction in manual handling efforts, improving worker safety and efficiency.
- Enhanced workflow with a seamless, one-direction process flow.
- Improved quality control with integrated core photo systems and real-time monitoring.