Project 11

Ze Global delivered the Core Shed Process Flow Optimization project to revolutionize core handling and storage operations. This project involved redesigning the core shed layout, integrating advanced roller systems, and introducing streamlined workflows to eliminate manual handling risks, reduce bottlenecks, and improve overall efficiency.


Key Features:

  1. Optimized Core Shed Layout:
    • Redesigned core shed with a one-directional workflow to minimize double handling.
    • Introduced access windows and expanded logging room space for better utilization.
  2. Advanced Roller Table Systems:
    • Upgraded to 9-meter roller tables for increased capacity.
    • Reduced manual handling with seamless core movement from racks to cutting and storage zones.
  3. Core Cutting and Photo Enhancements:
    • Integrated Almonte core saws for efficient and precise core cutting.
    • Mobile photo stands with real-time quality control for improved documentation.
  4. Phased Modifications:
    • Conducted modifications in two stages to ensure continuous operations during upgrades.
  5. Capacity Improvements:
    • Core table capacity increased by 400% compared to the previous setup.
    • Enhanced ability to handle higher volumes of core samples without delays.

Visual Media Section:

  • Video: Embed an animation showcasing the new core shed layout and process flow.
  • Technical Details: Include visuals of table layouts, modification stages, and capacity comparisons.

Project Impact:

  • 400% improvement in core handling capacity, ensuring faster processing and storage.
  • Reduced operational disruptions through phased modifications.
  • Enhanced workflow efficiency with advanced roller tables and optimized core movement.

Book an Appointment

Let’s Collaborate to Achieve Your Goals

Schedule a one-on-one consultation with our experts to discuss your project needs, explore tailored solutions, and take the next step toward success.