Ze Global successfully executed the Sandvik 710_No Sump Equipment Optimization project, which involved reconfiguring drill rig setups on platforms for improved efficiency and safety. The project aimed to streamline operational workflows by optimizing equipment positioning, enabling seamless fuel and rod management, and enhancing water recycling processes.
Key Features:
- Drill Rig Setup Optimization:
- Comprehensive redesign of the drill rig setup on platforms with key positioning adjustments.
- Integration of a sump-free design to support efficient water management.
- Fuel and Rod Management:
- Relocation of fuel tanks and rod carrier units near operational zones for easy access.
- Long hose systems for uninterrupted fuel delivery to the drill rig.
- Water Recycling Integration:
- Suction pump system to redirect water from the drill hole into a centrifuge system for treatment.
- Treated water is cycled back into the mud mixer for reuse, reducing water wastage.
- Enhanced Work Platforms:
- Foldable platforms and ergonomic designs to support safe and efficient operations.
Visual Media Section:
- Video: Embed an animation video illustrating the optimized drill rig setup and water recycling system in action.
- Technical Layouts: Include visual diagrams and layouts showcasing the platform design, equipment placement, and operational workflow from pages 2–7 of the document.












Project Impact:
- Enhanced operational efficiency through optimized equipment placement.
- Reduced environmental footprint with an advanced water recycling system.
- Improved safety and accessibility for drill rig operations.