Project 2

Ze Global executed the Optimized Workflow Core Shed Design project to enhance the efficiency and functionality of core shed operations. By designing a highly organized layout and integrating advanced equipment, this project streamlined workflows, improved core handling, and introduced sustainable water recycling systems.


Key Features:

  1. Efficient Core Shed Layout:
    • Innovative design with separate zones for cutting, storage, and water recycling operations.
    • Optimized work floor layout for streamlined workflows, with easy access for personnel.
  2. Advanced Core Handling Systems:
    • Integrated 26-degree roller angle tables for efficient core movement.
    • Dual-core saw feed system to enhance operational efficiency.
  3. Water Recycling System:
    • Advanced drainage and filtration systems for sustainable water management.
    • Reduces water wastage and improves environmental compliance.
  4. Custom Engineering and Dimensions:
    • Work floor and cutting room layouts measured precisely to ensure operational scalability and efficiency.
    • Foldable roller tables and mobile core racks designed for adaptability and flexibility.

Visual Media Section:

  • Video: Embed an animation video showcasing the core shed layout, roller systems, and water recycling integration.
  • Technical Images: Include core shed perspective views, layout diagrams, and system components (as illustrated on pages 1–11).

Project Impact:

  • 50% improvement in workflow efficiency through optimized core shed operations.
  • Enhanced environmental sustainability with water recycling systems.
  • Reduced manual handling risks with ergonomic designs and advanced core movement systems.

Book an Appointment

Let’s Collaborate to Achieve Your Goals

Schedule a one-on-one consultation with our experts to discuss your project needs, explore tailored solutions, and take the next step toward success.