Ze Global transformed an old industrial building into modern and efficient office units. This project involved redesigning the layout to include functional spaces such as offices, storage areas, and washrooms, while addressing structural challenges and incorporating sustainable solutions for water and electrical systems.
Key Features:
- Office Layout Redesign:
- Converted the old building into three office units, a storage room, and a bathroom.
- Optimized internal layouts for maximum functionality and accessibility.
- Structural Improvements:
- Enhanced building stability and safety by modifying concrete workstations and entrance structures.
- Integrated air conditioning systems to improve comfort and usability.
- Water and Drainage Systems:
- Designed and installed a PVC drainage system connected to septic tanks for efficient wastewater management.
- Recommended solutions for main water sources, including drilling a well or using existing water ponds (subject to water quality checks).
- Electrical System Upgrades:
- Evaluated electrical appliance usage and calculated power requirements to ensure optimal generator sizing.
- Incorporated electrical connections for laptops, air conditioning, pumps, and lighting, with a total estimated consumption of 13.03 KW/h.
Visual Media Section:
- Video: Embed an animation showcasing the transformation from the old building to the modern office setup.
- Technical Details: Display diagrams of the office layout, drainage system, and electrical consumption calculations.
















Project Impact:
- Improved usability and functionality with modern office layouts and enhanced infrastructure.
- Environmentally sustainable solutions with efficient water drainage and electrical planning.
- Enhanced comfort and productivity for occupants with air conditioning and optimized spaces.